DESCRIPTION
PTT plans to install 4” gas pipeline from existing 28” main pipeline at the front of BV #11 to Toyota Motor (Thailand) Ltd., Samutprakarn. The total length of pipeline is approximately 2 kms.
PTT plans to install 4” gas pipeline from existing 28” main pipeline at the front of BV #11 to Toyota Motor (Thailand) Ltd., Samutprakarn. The total length of pipeline is approximately 2 kms.
Client: PTT Public Co., Ltd.
Location: Samutprakarn, Thailand
Completed date: September 2003
Category: Oil & Gas