Contact Us: 66 2 681-6669 Mon-Fri: 8:30am - 5:30pm

12 SPPS STEAM PIPELINE PROJECT

  • 12 SPPS STEAM PIPELINE PROJECT

DESCRIPTION

Sino-Thai Engineering & Construction Public Company Limited intends Pro-En Technologies, Ltd. to provide engineering preliminary design, cost estimation and detail design for 12 SPPs Steam Pipeline Project consist of the followings :

  1. GVTP, Vang Ta Pin Power Plant, Rayong, 5 metering stations and pipeline distance 2.7 km.
  2. GTS1, Tasit 1 Power Plant, Rayong, 1 metering station and pipeline distance 1.9 km.
  3. GTS2, Tasit 2 Power Plant, Rayong, 1 metering station and pipeline distance 1.3 km.
  4. GTS3, Tasit 3 Power Plant, Rayong, 1 metering station and pipeline distance 2.4 km.
  5. GTS4, Tasit 4 Power Plant, Rayong, 3 metering stations and pipeline distance 1.4 km.
  6. GNC, Nearby Sahapat Industrial Park/Kabin, Prachinburi, 7 metering stations and pipeline distance 3.0 km.
  7. GBL, Hi-Tech Industrial Estate/Bang Pa-In, Ayudhaya, 2 metering stations and pipeline distance 0.9 km, including cooling blow down pipeline 0.8 km. and demin. water pipeline 1.5 km.
  8. GBP, Hi-Tech Industrial Estate /Bang Pa-In, Ayudhaya, 3 metering stations and pipeline distance 1 km, including cooling blow down pipeline 2.2 km.
  9. GNLL2, Hemaraj Rayong Industrial Land/Bankhai, Rayong, 1 metering station and pipeline distance 0.9 km.
  10. GNPM, Hemaraj Saraburi Industrial Land/Nong Khae, Saraburi, 3 metering stations and pipeline distance 3 km.
  11. GNRV1, Suranaree Industrial Zone, Nakorn Rachasrima, 2 metering stations and pipeline distance 1 km.
  12. GNRV2, Suranaree Industrial Zone, Nakorn Rachasrima, 2 metering station and pipeline distance 1.3 km.

Client: Sino-Thai Engineering & Construction Plc.

Location: Rayong, Prachinburi, Ayudhaya, Saraburi, Nakornratchasima

Completed date: Present

Category: Oil & Gas