DESCRIPTION
Glow SPP has planned to supply steam product from the plant
through a new pipeline system to a customer in EIA called
SMPC 3. SMPC 3 is presently under construction that will require
steam for operation processes at two different pressure
levels, low pressure of 15 barg and medium pressure of 25 barg in May 2005.
The project is located in Maptaphut Industrial Estate, Rayong.