Contact Us: 66 2 681-6669 Mon-Fri: 8:30am - 5:30pm

Engineering Service for Steam Supply Pipeline to ABCT Project

  • Engineering Service for Steam Supply Pipeline to ABCT Project

DESCRIPTION

Glow has planned to send 10” low pressure steam pipe, which the design pressure is 17 barg, design temperature is 240°C and insulation thickness is 70 mm. The total length is approximately 1,500 meters. The tie-in point is from existing steam pipe line no. 8”-SL-383402-C324 at EFT’s piperack column no. E03-020 behind THASCO with block valve to another side of tie in point at piperack column no. 209 beside TEC plant with blind flange.
In addition, for 4” condensate return line, the design pressure for is 6 barg., design temperature is 90°C and insulation thickness is 40 mm. The tie in point with blind flange from beside TEC Plant at EFT’s piperack column no. 209 along the EFT’s piperack to another side of tie in point at piperack column no. 159 beside TPAC plant.

Client: Glow SPP1 Co., Ltd.

Location: Rayong, Thailand

Completed date: July 2006

Category: Power Generation