JETTY DEVELOPMENT AND LNG RECEIVING TERMINAL PROJECT

  • JETTY DEVELOPMENT AND LNG RECEIVING TERMINAL PROJECT

DESCRIPTION

Jetty Development and LNG Receiving Terminal Project in Map Ta Phut Industrial Estate, Rayong Province.  Major facilities included a berth to serve LNG carrier with 125,000 to 264,000 cubic meters capacity, 2 each – 160,000 cubic meters LNG storage tanks, LNG vaporization and send-out facilities, and utilities system. The Terminal has a capacity of 5 million tons of LNG a year.

The project owner, PTTLNG Co., Ltd., has appointed Fluor Daniel Eastern, Inc. as its Project Management Consultant (PMC). Span Company Limited has been selected by Fluor as its local consultant to perform engineering parts on civil, structural, architectural, electrical, water supply and sanitary systems in the project.

Pro-En’s engineer has worked in Span electrical engineering section between September 2006 to March 2012. The work includes design and subsequent supervision of electrical installation work by the contractor. Major work includes a 115 kV power system consisting of 6 km run of 115 kV underground feeder from PEA’s Substation to the Terminal, a 115 kV substation in the Terminal with 5 bays of 115 kV GIS, 2 sets of 20/31.5 MVA 115/22 kV Transformers, and  22 kV/400/230V power system for plant operations.

Client: Span Co., Ltd.

Location: Rayong, Thailand

Completed date: March 2012

Category: Industrial Estate