•To develop Pro-En's Finances, reputation, people and innovation / technologies to position the firm to be leading engineering consulting and environmental specialist firms in Thailand.
•To become "The consultant of Choice" for major clients and industry leaders
•To become "The partner of Choice" for leading foreign firms to participate in major projects in Thailand.
•To maintain a work environment that encourages professional / career growth and become "the Employer of Choice" in the consulting profession.
•To maintain the firm's culture that is able to bridge the cultural gap and business practice and develop a reputation as a "multinational organization".
Contact Us | Site Map | News

Highlights
 
EIA OF 3D SEISMIC SURVEY BLOCK L53/43, L54/43
The EIA Study for the development of a new reserve in PTTEP's concession at L53/43and L54/43 Blocks, the blocks are located in the Provinces of Suphanburi.  
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
EIA OF LUMPINI PLACE PINKLAO PROJECT
The EIA Study for Condominium Project located at Pinklao, Bangkok Noi District, BKK. The project comprise of 580 units in a high-rise building and completed facilities.  
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
EIA OF CHAROENNAKORN 39 CONDOMINIUM
The EIA Study for Charoennakorn 39 Condominium Project comprise a 3-30 storeys residential buildings with more than 200 units locating in an area of 13 rai near Chaophraya River, Bangkok.  
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
PEA 28 BRANCH OFFICE
Provincial Authority Electricity's branch office in 28 locations, each branch office consisting of office building 310 m2, Warehouse 120m2, Staff housing 320 m2 and parking area 2,360 m2. The tatal construction price of 28 branch offices as 288 Million B  
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
DISTRIBUTION DISPATCHING CENTER
The Consulting Services to Provincial Authority Electricity during the construction period of Distribution Dispatching Center Stage 1 in the area of building facilities work, DMS development systems, DMS computer system, field devices and UHF communicati  
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
725 MW BOWIN POWER PLANT (IPP)
The construction of a 725 MW Combined Cycle Gas Fired Power Plant in the Frame of the Thai IPP Program.  
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
230 KV UNDERGROUND TRANSMISSION CABLE FOR VIBHAVADI TERMINAL STATION
The engineering consulting in civil & electrical disciplines for construction of 230 kV underground transmission cables. The cable is designed to install in Cable Tunnel ID 3,200 mm. with cooling system in total of 8.0 km. Length.  
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
NEW STEAM SUPPLY PIPELINE FROM GLOW SPP 3 TO SMPC 3 PROJECT
Glow SPP supply steam product from the plant through a new pipeline system to a customer in EIE called SMPC 3. SMPC 3 requires steam for operation processes at two different pressure levels, low pressure of 15 barg and medium pressure of 25 barg.  
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
DPCU AND PIPING MODIFICATION PROJECT
The Construction of Dew Point Control Unit (DPCU) in PTT Gas Separation Plant in Rayong.  
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
COMBINED HEAT AND POWER SYSTEM PROJECT
The installation of Heat Recovery Boiler 70 ton/hr of steam and AC synchronous generator of 13.25 MW capacity.  
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -